Values the right but not the obligation to expand, delay, switch or abandon an investment, producing an option value added to a standard valuation.

Assess actors, options and risksEvidence: DocumentedPrimary technique, runs in step 5.3Strongest statement: predict, without claiming a cause

What it does

Values the right but not the obligation to expand, delay, switch or abandon an investment. Artefact: an option value added to a standard valuation.

When to use it

Use when a user asks what flexibility to wait, expand or abandon a project is worth beyond its base valuation.

When it does not fit

Volatility is chosen to give a desired answer, or the option cannot actually be exercised.

Result format

The result gives a standard valuation of the investment and an option value for the right to expand, delay, switch or abandon it, added to that valuation. It states which option is valued and lists the assumptions behind the option value.

Method steps

  1. State the investment or decision, and the main uncertainty that will be resolved over time.
  2. List the options that management could use as that uncertainty resolves: defer, expand, contract, switch or abandon.
  3. Build a decision tree. Each outcome of the uncertainty leads to a decision point where the options apply.
  4. Value each end outcome.
  5. Work back from the end of the tree. At each decision point take the best choice, then weight by probability.
  6. Compute the value of the project without the options (a plain expected value).
  7. Subtract: the difference is the value of the options.
  8. Write the result: the tree, the options valued, the values with and without them, and the inputs the answer depends on most.

Steps drawn from: Wikipedia, Real options valuation, Iowa State University, Advanced investment analysis and New Zealand Ministry of Transport, Adaptive investment management. Pricing formulas such as Black-Scholes are an alternative to the tree.

Requirements on the material

PropertyRequirement typeRequirement
Content typeAlways appliesrequires=tabular
Unit of analysisAlways appliesrequires=topic
Variable typesRaises a warningprefers=ratio
Level of detail availableAlways appliesrequires=aggregate tables
Appraises source credibilityApplies in some casesno

Not restricted on: Structure, Time structure, How the sample was chosen, Number of sources, Whether sources can be joined, Amount of material, Known data problems, Producer interest, Source dependence, Origin, Document genre, Language, Personal information, Security classification, Licence.

Minimum materialAsset value, volatility, decision dates and exercise costs. Volatility is hard to supply for assets that are not traded.
Additional sources needednone
Not for (rules)none
Not for (text)Wrong choice when volatility is chosen to give a wanted answer or the option cannot actually be exercised.

Choosing and ordering

Kind of techniquePrimary technique, runs in step 5.3
Phase taganalyse
Other phase tagsconclude
Kind of findingoption ranking; risk
Question answeredhow much; which option
Strongest statement it supportspredict, without claiming a cause
Needs as input
Makes as output
Must exist firstNone
Loop targetreturn to analyse

Library checks by stakes

Each stakes level includes the checks of the level below it. Checks that need a person apply at high stakes only, so the process leaves them out at lower stakes (decision 38). Repeatability: deterministic.

StakesCheckPerson involvedCounts as a different method
exploratoryinput validationnoneno
exploratorycode execution for arithmeticnoneno
decision-informinginput validationnoneno
decision-informingcode execution for arithmeticnoneno
decision-informingassumption and limitation statementnoneno
decision-informingsensitivity analysisnoneno
high-stakesinput validationnoneno
high-stakescode execution for arithmeticnoneno
high-stakesassumption and limitation statementnoneno
high-stakessensitivity analysisnoneno
high-stakessecond technique with different assumptionsnoneconditional
high-stakesexpert reviewneededno
high-stakesindependent reviewneededno

Failure modes and limits

Model suitabilityhuman judgement required
Typical model failureChooses a volatility that produces the wanted value and treats an option that cannot be exercised as valuable.
Error sourcesinput data; statistical assumptions; expert opinion
Certainty limitsCertainty drops because the technique is unconfirmed and no evidence on decision quality was collected, because volatility is not observable for untraded assets (imprecision), and when exercise is not feasible (indirectness).

Evidence and tag basis

Documented. Real options analysis applies option valuation to capital budgeting: a real option is the right but not the obligation to act, such as to defer, expand or abandon. A decision tree with decision points can be used to value the options. (Wikipedia, Real options valuation; Iowa State University; New Zealand Ministry of Transport)