AO-14 Real options analysis
Values the right but not the obligation to expand, delay, switch or abandon an investment, producing an option value added to a standard valuation.
What it does
Values the right but not the obligation to expand, delay, switch or abandon an investment. Artefact: an option value added to a standard valuation.
When to use it
Use when a user asks what flexibility to wait, expand or abandon a project is worth beyond its base valuation.
When it does not fit
Volatility is chosen to give a desired answer, or the option cannot actually be exercised.
Result format
The result gives a standard valuation of the investment and an option value for the right to expand, delay, switch or abandon it, added to that valuation. It states which option is valued and lists the assumptions behind the option value.
Method steps
- State the investment or decision, and the main uncertainty that will be resolved over time.
- List the options that management could use as that uncertainty resolves: defer, expand, contract, switch or abandon.
- Build a decision tree. Each outcome of the uncertainty leads to a decision point where the options apply.
- Value each end outcome.
- Work back from the end of the tree. At each decision point take the best choice, then weight by probability.
- Compute the value of the project without the options (a plain expected value).
- Subtract: the difference is the value of the options.
- Write the result: the tree, the options valued, the values with and without them, and the inputs the answer depends on most.
Steps drawn from: Wikipedia, Real options valuation, Iowa State University, Advanced investment analysis and New Zealand Ministry of Transport, Adaptive investment management. Pricing formulas such as Black-Scholes are an alternative to the tree.
Requirements on the material
| Property | Requirement type | Requirement |
|---|---|---|
| Content type | Always applies | requires=tabular |
| Unit of analysis | Always applies | requires=topic |
| Variable types | Raises a warning | prefers=ratio |
| Level of detail available | Always applies | requires=aggregate tables |
| Appraises source credibility | Applies in some cases | no |
Not restricted on: Structure, Time structure, How the sample was chosen, Number of sources, Whether sources can be joined, Amount of material, Known data problems, Producer interest, Source dependence, Origin, Document genre, Language, Personal information, Security classification, Licence.
| Minimum material | Asset value, volatility, decision dates and exercise costs. Volatility is hard to supply for assets that are not traded. |
|---|---|
| Additional sources needed | none |
| Not for (rules) | none |
| Not for (text) | Wrong choice when volatility is chosen to give a wanted answer or the option cannot actually be exercised. |
Choosing and ordering
| Kind of technique | Primary technique, runs in step 5.3 |
|---|---|
| Phase tag | analyse |
| Other phase tags | conclude |
| Kind of finding | option ranking; risk |
| Question answered | how much; which option |
| Strongest statement it supports | predict, without claiming a cause |
| Needs as input |
|
| Makes as output |
|
| Must exist first | None |
| Loop target | return to analyse |
Library checks by stakes
Each stakes level includes the checks of the level below it. Checks that need a person apply at high stakes only, so the process leaves them out at lower stakes (decision 38). Repeatability: deterministic.
| Stakes | Check | Person involved | Counts as a different method |
|---|---|---|---|
| exploratory | input validation | none | no |
| exploratory | code execution for arithmetic | none | no |
| decision-informing | input validation | none | no |
| decision-informing | code execution for arithmetic | none | no |
| decision-informing | assumption and limitation statement | none | no |
| decision-informing | sensitivity analysis | none | no |
| high-stakes | input validation | none | no |
| high-stakes | code execution for arithmetic | none | no |
| high-stakes | assumption and limitation statement | none | no |
| high-stakes | sensitivity analysis | none | no |
| high-stakes | second technique with different assumptions | none | conditional |
| high-stakes | expert review | needed | no |
| high-stakes | independent review | needed | no |
Failure modes and limits
| Model suitability | human judgement required |
|---|---|
| Typical model failure | Chooses a volatility that produces the wanted value and treats an option that cannot be exercised as valuable. |
| Error sources | input data; statistical assumptions; expert opinion |
| Certainty limits | Certainty drops because the technique is unconfirmed and no evidence on decision quality was collected, because volatility is not observable for untraded assets (imprecision), and when exercise is not feasible (indirectness). |
Related techniques
- pairs with AO-10 Cost-benefit analysis: the option value is added to a standard valuation
- substitutes for AO-13 Decision tree and expected value: when volatility of the asset can be estimated and decision dates are fixed, a pricing model replaces a probability tree
Evidence and tag basis
Documented. Real options analysis applies option valuation to capital budgeting: a real option is the right but not the obligation to act, such as to defer, expand or abandon. A decision tree with decision points can be used to value the options. (Wikipedia, Real options valuation; Iowa State University; New Zealand Ministry of Transport)
Tag basis: input profile inference; selection inference; sequencing inference; robustness inference. All tag values are inference unless a source is named.