PJ-07 Technology S-curve analysis (logistic growth, technology substitution curve)

Fit a logistic curve to an adoption or performance series to estimate a ceiling and an inflection date, as a draft result.

Project forwardEvidence: DocumentedPrimary technique, runs in step 5.3Strongest statement: predict, without claiming a cause

What it does

Fits a slow, fast and saturating curve to adoption or performance. Artefact: a fitted curve with ceiling and inflection date.

When to use it

Use when you ask how far or how fast adoption or performance will grow and the series has passed its inflection point or a ceiling is known.

When it does not fit

It is fitted before the inflection point (the ceiling is then poorly determined), the metric changes meaning, or the technology is replaced instead of saturating.

Result format

The result is a fitted logistic curve for adoption or performance, showing the slow, fast and saturating phases. It states the ceiling and the inflection date.

Method steps

  1. Choose the metric: adoption share, cumulative units or a performance measure. State the ceiling it could reach, if the material gives one.
  2. Collect the time series and note how much of the curve it covers. A series that covers only the early part gives a wide range of fits.
  3. Check the conditions for an S-curve: growth that feeds on itself and a limit, such as a finite market or competition for a limited resource.
  4. Fit a logistic curve (or another S-shaped form such as Gompertz). Record the ceiling, the inflection date and the growth rate.
  5. Give the range of ceilings and inflection dates that fit the data about equally well.
  6. Write the result: the fitted curve, the ceiling and inflection date with their ranges, and the share of the curve the data covers.

Steps drawn from: Modis, Strengths and weaknesses of S-curves, Technological Forecasting and Social Change 2007 and Stevens Institute, forecasting technological substitutions.

Requirements on the material

PropertyRequirement typeRequirement
StructureApplies in some casesrequires=structured; requires=semi-structured
Content typeAlways appliesrequires=time series
Unit of analysisAlways appliesrequires=variable
Variable typesRaises a warningprefers=ratio; prefers=counts or fractions
Time structureApplies in some casesrequires=aggregate time series
Level of detail availableAlways appliesrequires=aggregate tables
Appraises source credibilityApplies in some casesno

Not restricted on: How the sample was chosen, Number of sources, Whether sources can be joined, Amount of material, Known data problems, Producer interest, Source dependence, Origin, Document genre, Language, Personal information, Security classification, Licence.

Minimum materialObservations past the inflection point, or a credible ceiling supplied from outside the series.
Additional sources needednone
Not for (rules)none
Not for (text)The curve is fitted before the inflection point so the ceiling is poorly determined, the metric changes meaning, or the technology is replaced instead of saturating.

Choosing and ordering

Kind of techniquePrimary technique, runs in step 5.3
Phase taganalyse
Other phase tagsnone
Kind of findingtrend
Question answeredwhat next; how much
Strongest statement it supportspredict, without claiming a cause
Needs as input
Makes as output
Must exist firstNone
Loop targetreturn to analyse

Library checks by stakes

Each stakes level includes the checks of the level below it. Checks that need a person apply at high stakes only, so the process leaves them out at lower stakes (decision 38). Repeatability: repeatable with fixed settings.

StakesCheckPerson involvedCounts as a different method
exploratoryinput validationnoneno
decision-informinginput validationnoneno
decision-informingheld-out validationnoneno
decision-informingsensitivity analysisnoneno
high-stakesinput validationnoneno
high-stakesheld-out validationnoneno
high-stakessensitivity analysisnoneno
high-stakessecond technique with different assumptionsnoneconditional
high-stakesleakage checknoneno
high-stakesassumption and limitation statementnoneno

Failure modes and limits

Model suitabilitymodel plus code
Typical model failureReports a ceiling from a fit made before the inflection point as if it were well determined.
Error sourcesinput data; statistical assumptions
Certainty limitsCertainty drops when the fit starts before the inflection point (imprecision), the ceiling is assumed (risk of bias), or the metric changes meaning (indirectness).

Evidence and tag basis

Documented. Logistic and other S-shaped curves (Gompertz, Fisher-Pry, Weibull) are widely used to forecast technological substitution and adoption. Modis sets out when an S-curve can be used and how fitting and its uncertainties work. (Modis 2007, Technological Forecasting and Social Change; Stevens Institute abstract)

Tag basis: input profile inference; selection inference; sequencing inference; robustness inference. All tag values are inference unless a source is named.